Welcome to Plbg.com
Thank you to all the plumbing professionals who offer their advice and expertise

Over 698,000 strictly plumbing related posts

Plumbing education, information, advice, help and suggestions are provided by some of the most experienced plumbers who wish to "give back" to society. Since 1996 we have been the best online (strictly) PLUMBING advice site. If you have questions about plumbing, toilets, sinks, faucets, drains, sewers, water filters, venting, water heating, showers, pumps, and other strictly PLUMBING related issues then you've come to the right place. Please refrain from asking or discussing legal questions, or pricing, or where to purchase products, or any business issues, or for contractor referrals, or any other questions or issues not specifically related to plumbing. Keep all posts positive and absolutely no advertising. Our site is completely free, without ads or pop-ups and we don't tract you. We absolutely do not sell your personal information. We are made possible by:  

Post New
Search
Log In
How to Show Images
Newest Subjects
 Should I redo shower pan over concrete? Concerned about weight
Author: Keneye (PA)

Just gutted a shower in a 50 year old house. The old shower pan is about an inch or more of concrete. I am concerned that by adding a sloping base, membrane and then top coat of mortar, I may be adding too much weight. The shower is about 28" wide by 7'long.

Post Reply

 Re: Should I redo shower pan over concrete? Concerned about weight
Author: kingshakabobo (IL)

Are you talking about not removing the existing concrete?

If the structure is in good shape and suitable for tile, a couple hundred pounds of material should be ok. I would definitely remove all the old concrete.

Post Reply

 Re: Should I redo shower pan over concrete? Concerned about weight
Author: packy (MA)

do not leave the old base...
rip up to the floor joists, add bracing to make it stronger as well as nice and level.
cut out the old trap.
snake the pipe while the end is wide open.
use a sheilded no hub clamp to put a new plastic trap and riser.
new plywood glued and screwed to the joists.
leave at least a 5-6 inch circle cut out around the riser.
you now have an area that you can drive an F 450 across.

Post Reply





Please note:
  • Inappropriate messages or blatant advertising will be deleted. We cannot be held responsible for bad or inadequate advice.
  • Plbg.com has no control over external content that may be linked to from messages posted here. Please follow external links with caution.
  • Plbg.com is strictly for the exchange of plumbing related advice and NOT to ask about pricing/costs, nor where to find a product (try Google), nor how to operate or promote a business, nor for ethics (law) and the like questions.
  • Plbg.com is also not a place to ask radiant heating (try HeatingHelp.com), electrical or even general construction type questions. We are exclusively for plumbing questions.

Search for plumbing parts on our sponsor's site:




Special thanks to our sponsor:
PlumbingSupply.com


Copyright© 2024 Plbg.com. All Rights Reserved.