Plumbing education, information, advice, help and suggestions are provided by some of the most experienced plumbers who wish to "give back" to society. Since 1996 we have been the best online (strictly) PLUMBING advice site. If you have questions about plumbing, toilets, sinks, faucets, drains, sewers, water filters, venting, water heating, showers, pumps, and other strictly PLUMBING related issues then you've come to the right place. Please refrain from asking or discussing legal questions, or pricing, or where to purchase products, or any business issues, or for contractor referrals, or any other questions or issues not specifically related to plumbing. Keep all posts positive and absolutely no advertising. Our site is completely free, without ads or pop-ups and we don't tract you. We absolutely do not sell your personal information. We are made possible by:
Author:
ksujeff99 (KS)
First, thank you for those that take your time to answer questions on this site. This forum is very helpful.
I am paying a contractor to finish my basement which includes a bathroom with a shower. The plumbing under the slab was put in when we built our house. See the image below of the rough plumbing before the concrete was poured. I have a question about the venting. Currently the only vent line that the contractor is using is the one behind the sink, which is the one in the top of the photo. The vent line close to the shower (shower drain is located under the black box with rocks on it) is still capped. Is my shower drain too far away from the vent?
Click link for larger image
[s17.postimg.org]
Thanks, Jeff
Edited 1 times.
|
Post Reply
|
Author:
packy (MA)
that vent needs to be used.
the toilet flushing past the shower trap will syphon that trap if it's vent is not used.
also, my code says plastic pipe must be surrounded by soft sand for 6 inches in all directions.(not sharp gravel).
get the contractor to follow regulations or get another contractor...
|
Post Reply
|
Author:
ksujeff99 (KS)
I edited the link. Thanks.
|
Post Reply
|
Author:
ksujeff99 (KS)
Packy, thanks for your reply. I should note that the contractor finishing my basement is not who put in the rough plumbing under the slab. That was my builder, about 6 years ago.
I found in my research elsewhere that the trap must be within 5 feet of the vent. Would that apply here?
Edited 1 times.
|
Post Reply
|
Author:
packy (MA)
a trap must be within a certain distance from its vent but that is not the shower trap vent it is the toilet vent. the shower vent is the closer pipe in your picture.
if the contractor does not want to utilize it then get someone who understands plumbing codes.
the below the floor plumbing is installed correctly.
the contractor's refusal to use what is there is the problem.
also... put fine sand around the pipes.. not sharp edged gravel..
|
Post Reply
|
Please note:
- Inappropriate messages or blatant advertising will be deleted. We cannot be held responsible for bad or inadequate advice.
- Plbg.com has no control over external content that may be linked to from messages posted here. Please follow external links with caution.
- Plbg.com is strictly for the exchange of plumbing related advice and NOT to ask about pricing/costs, nor where to find a product (try Google), nor how to operate or promote a business, nor for ethics (law) and the like questions.
- Plbg.com is also not a place to ask radiant heating (try HeatingHelp.com), electrical or even general construction type questions. We are exclusively for plumbing questions.
Search for plumbing parts on our sponsor's site:
Special thanks to our sponsor: