Plumbing education, information, advice, help and suggestions are provided by some of the most experienced plumbers who wish to "give back" to society. Since 1996 we have been the best online (strictly) PLUMBING advice site. If you have questions about plumbing, toilets, sinks, faucets, drains, sewers, water filters, venting, water heating, showers, pumps, and other strictly PLUMBING related issues then you've come to the right place. Please refrain from asking or discussing legal questions, or pricing, or where to purchase products, or any business issues, or for contractor referrals, or any other questions or issues not specifically related to plumbing. Keep all posts positive and absolutely no advertising. Our site is completely free, without ads or pop-ups and we don't tract you. We absolutely do not sell your personal information. We are made possible by:
Author:
Fsostre (NY)
My former contractor (who I fired)built me a new bathroom with tub, shower, toilet and double sinks.To feed water to all of these fixtures, he used a half inch pex tube which he tapped into the cold water line from the kitchen sink as a source. Obviously a cobb job. My new contractor wants to run a 3/4 inch line from our main water line into the bathroom. However, this will be very expensive because everything is closed up. My question is this: Can we use the exsisting 1/2 inch line and simply disconnect it from the kitchen sink and connect it to our main water supply? Would that create enough pressure for a full bath?
Edited 1 times.
|
Post Reply
|
Author:
m & m (MD)
If you are going to stay with 1/2", just leave it connected the way it is. It won't make any difference.
|
Post Reply
|
Author:
bernabeu (SC)
no
your new contractor is correct
? what did the inspector say ?
surely the job is 'permitted' and inspected
==============================================
"Measure Twice & Cut Once" - Retired U.A. Local 1 & 638
|
Post Reply
|
Author:
packy (MA)
if you can get to the water lines from below, you can run each cold back to a manifold at the water main and each hot back to a manifold at the water heater.
|
Post Reply
|
Author:
North Carolina Plumber (NC)
Even with a 1/2" pipe you should have plenty of pressure to run a fixture in the new bath. If not you have other problems also.
|
Post Reply
|
Author:
packy (MA)
yeah, 1/2 will be plenty to run one fixture. problems come with running more than one..
|
Post Reply
|
Please note:
- Inappropriate messages or blatant advertising will be deleted. We cannot be held responsible for bad or inadequate advice.
- Plbg.com has no control over external content that may be linked to from messages posted here. Please follow external links with caution.
- Plbg.com is strictly for the exchange of plumbing related advice and NOT to ask about pricing/costs, nor where to find a product (try Google), nor how to operate or promote a business, nor for ethics (law) and the like questions.
- Plbg.com is also not a place to ask radiant heating (try HeatingHelp.com), electrical or even general construction type questions. We are exclusively for plumbing questions.
Search for plumbing parts on our sponsor's site:
Special thanks to our sponsor:
|